Client: Mirvac Construction Group for Origin Energy

Client: Mirvac Construction Group for Origin Energy
Location: Spring Gully, Queensland
Purpose: Weed Seed Decontamination
Site Type: Gas field site in Central Queensland
Product Detail:

The Heavy Duty Deluge HDD45R Weed Seed Wash was installed to provide operations with a relocateable, high demand wash system for the process of weed seed management and environmental management of vehicles passing through the facility.

The wash system incoroprates the Heavy Duty Deluge wheel and chassis wash system and waste water treatment system.