Recently Completed Project - ABC

CLIENT:

Adelaide Brighton Cement

SITE:

Birkenhead Operations, Eleder, South Australia

Purpose: Environmental wash system for the prevention site materials and chemicals being tracked onto public roads from trucks and vehicles leaving the site.
Site Type: Heavy Industrial
Product Detail: Design and Construct of a Heavy Duty Deluge 45 automated dual purpose wash system and waste water treatment and reticulation system. Automated traffic management system including auto slide gates with card reading system for vehicle identification and tracking.
Commissioned: 2013